Rank Construction

RANK Magizhagam

About CRT Magizhagam

CRT is our esteemed partner company, and CRT Magizhagam is strategically located in a wellestablished residential area with essential amenities and convenient access to major commercial zones. This redevelopment project of the Housing Board reflects our commitment to social responsibility and active involvement in the affordable housing sector.

Category – Appartment
Configuration – 2 & 3 BHK
Area – 1000-1500 SQ. FT

CRT Magizhagam E- Brochure

Gallery

Floor Plan

Amenities

Lift 2 No (6 passengers) & cable. Johnson or Kone (or) Equivalent.

Automatic Genset (Generator) 1 No. with acoustics box and auto start for lift, common area-40 KVA Kirloskar.

6" Bore well 3 No., Bore well motors, Sump motor & Drinking water motors 3 No. and Pipelines. (Total 3 Bore Wells)

Reserved car parking and common two wheeler parking for each flat.

Security with CC Camera (viewable through TV channel)

Intercom with inter conferencing

Individual post box for each flat

Softner treatment for water supply system to remove hardness improving the foaming effect.

R.C.C. Sump (2 Nos) | Septic tank | Sump sensor line 2 No's

Fire safety water line provision for each floor

EB Main Panel board | 3 phase EB connection for each flat.

Lightning Arrester | Earth provision

Cable wire for generator power, EB line, and service line & Common lighting arrangement

BSNL line & cable line | Rain water harvesting

Side pavements & Drainage, Planter boxes

5' Compound wall All round & Gate

Specifications

  • Reinforced cement concrete framed structure M 20 mix.
    Reinforced cement concrete framed structure steel Tor 50 (Fe 500 steel).
  • Foundation will be designed based on SBC with test report.
  • Column & beams designed as per IS 456 – 2000 for ground floor parking & Five floors.
  • The height of each floor will be of 10′ from the floor finishing level, (Excluding parking), The height of ground floor parking will be og 9′ from the floor finishing level.
  • Exterior walls 9″ thick and interior walls as per architectural specifications.
  • The main door will be of teak frame fitting and cylindrical locks. (For each door – One grill and other of complete teak wood panel shutter).
  • Other doorframes will be of Sal and Skin flush doors with paint finish. (With Mortise Lock – SS Finish / Antique).
  • FOR Toilet doors FRP Coated water proof Flush Doors.
  • UPVC windows with MS grills and 4mm thick-pinned glass will be provided with Mosquito mesh.
  • Aluminum louvered ventilators with MS grills will be provided for all bath rooms.
  • Lever locks for all other doors. (Rs. 1000 & 600 for rooms & Toilet) SS hand rails for stair case.
  • Corridor hand rails of brick work with SS Pipes.
  • Red Bricks shall be used.
  • All Ceiling will be direct putty finish with white cement base putty.
  • Plastering will be of cm, 1:3 mix (wherever needed).
  • Inner and outer wall area will be plastered with cm, 1:5 mix.
  • Complete concealed wiring with ISI copper wires.
  • Modular switches will be provided.
    TV and Telephones points at hall and in all bedrooms.
  • Suitable switches will be provided wherever necessary.
  • Intercom for all flats connected to security with inters conference facility.
  • A/C. point provision in all bedrooms.
  • Water heater point provision in all bathrooms.
  • Wising/Dryer point provision in Utility room & all balconies.
  • In kitchen exhaust fan & chimney provisions will be provided.
  • UPS Provision will be considered in the circuit.
  • Complete concealed pipelines inside the building and open pipelines in outer areas.
  • Foam flow CP JAQUAR or Equivalent pipe fittings will be provided.
  • Parry ware or Hind ware or equivalent closest and Counter top washbasins will be provided in light colours.
  • Drinking water line for Kitchen only.
  • Vitrified tiles 4’x2′ for Hall/Dining and other area, with spacers shall be provided.
  • Kitchen platform with granite top with glazed tiles up to 4’6″ height above cooking platform.
  • Staircase flooring will be of granite & corridor will be of kotta stone.
  • Lift front Granite cladding.
    Dodaing of glazed tiles sup to 8’6″ ht in toilets.
  • Flooring in toilets will be of anti skid ceramic tile finish.
  • Grano flooring for paring area/Drive way paver blocks.
  • Granite Sink of size 2 x 1.5 x 1″ depth.
  • Inner walls areas will be finished Interior emulsion paint over putty.
  • Exterior walls will be finished with exterior emulsion paint as per architect’s colour scheme.
  • Main door polished and all others doors & grill will be painted with two coat of Enamel paint over one coat of primer and putty.
  • Red tiles over bricks jelly & lime mortar mix for required slope.
  • Parapet wall will be constructed to a ht of 3′.6″.

Location